Power Source Electric performed the electrical and mechanical equipment upgrades for the Downtown Elementary School
This project includes the replacement of HVAC equipment and associated systems in a renovated area of 84,070 square feet. Construction Period 2021-2022. Power Source Electric performed the electrical for the mechanical equipment upgrades. Mechanical upgrades included the replacement of outdated HVAC Mechanical Equipment for the Downtown Elementary School.
The scope of the work included replacing the entire chilled water system including the pumps, piping modifications, valves and actuators. Air Handling Units (AHU-1, 2, & 3), Rooftop Units (RTU-1, 2, 3), and Kitchen Exhaust Makeup Air Units were replaced.
All Controls in the school were completely replaced for all units and systems. Air Handling Units (AHU-1, AHU-2, & AHU-3) provide ventilation air to unit ventilators. New Air handling units were installed with GPS ionizers with a self-cleaning mode and UL-2998 certificates. Rooftop Units were replaced with gas-fired, direct expansion units. The entire chilled water system including piping/pumps was replaced with a 230-ton air-cooled scroll chiller.
All equipment was replaced to meet current energy codes. Construction Procurement Method: Design-Build
- Memphis-Shelby County Schools, Woodstock Middle School
- Memphis-Shelby County Schools, Carver High School.
Additional HVAC projects for Memphis-Shelby County
•Bolton High School, HVAC Replacement, 2021
•Southwind Elementary School, HVAC Replacement, 2022
•Kipp-Howell School, HVAC Replacement, 2023
•Lowrance School, HVAC Replacement, 2020
•Whitehaven Elementary School, HVAC Replacement ,2023
•Southwind High School, HVAC Replacement, 2024
•Kirby High School, HVAC Replacement, 2023
•Airways Cooling Tower, HVAC Replacement, 2024
•Avon Lenox, Chiller Replacement, 2024
•Treadwell Elementary School, Chiller Replacement, 2024
•Hamilton K-8 School, HVAC, 2023
•Central High School, HVAC, 2023
•SCS Administration, Cooling Tower, 2024
•Barnes Admin, Cooling Tower, 2024
•Northeast Prep, HVAC Replacement, 2018
•Georgian Hills Middle School, HVAC Replacement, 2018
•Jackson Elementary, HVAC Replacement, 2018
•Hanley Elementary, HVAC Replacement, 2018
•Ida B Wells, HVAC Replacement, 2018
•Oakhaven, HVAC Replacement, 2022
•Raleigh Egypt HS, HVAC Replacement, 2024
•Kingsbury Middle School, HVAC Replacement, 2022
•Carver High School, HVAC Replacement, 2021
•Overton High School, HVAC Replacement, 2024
This project includes the replacement of HVAC equipment and associated systems in a renovated area of 84,070 square feet. Construction Period 2021-2022. Power Source Electric performed the electrical for the mechanical equipment upgrades. Mechanical upgrades included the replacement of outdated HVAC Mechanical Equipment for the Downtown Elementary School.
The scope of the work included replacing the entire chilled water system including the pumps, piping modifications, valves and actuators. Air Handling Units (AHU-1, 2, & 3), Rooftop Units (RTU-1, 2, 3), and Kitchen Exhaust Makeup Air Units were replaced.
All Controls in the school were completely replaced for all units and systems. Air Handling Units (AHU-1, AHU-2, & AHU-3) provide ventilation air to unit ventilators. New Air handling units were installed with GPS ionizers with a self-cleaning mode and UL-2998 certificates. Rooftop Units were replaced with gas-fired, direct expansion units. The entire chilled water system including piping/pumps was replaced with a 230-ton air-cooled scroll chiller.
All equipment was replaced to meet current energy codes. Construction Procurement Method: Design-Build
- Memphis-Shelby County Schools, Woodstock Middle School
- Memphis-Shelby County Schools, Carver High School.
Additional HVAC projects for Memphis-Shelby County
•Bolton High School, HVAC Replacement, 2021
•Southwind Elementary School, HVAC Replacement, 2022
•Kipp-Howell School, HVAC Replacement, 2023
•Lowrance School, HVAC Replacement, 2020
•Whitehaven Elementary School, HVAC Replacement ,2023
•Southwind High School, HVAC Replacement, 2024
•Kirby High School, HVAC Replacement, 2023
•Airways Cooling Tower, HVAC Replacement, 2024
•Avon Lenox, Chiller Replacement, 2024
•Treadwell Elementary School, Chiller Replacement, 2024
•Hamilton K-8 School, HVAC, 2023
•Central High School, HVAC, 2023
•SCS Administration, Cooling Tower, 2024
•Barnes Admin, Cooling Tower, 2024
•Northeast Prep, HVAC Replacement, 2018
•Georgian Hills Middle School, HVAC Replacement, 2018
•Jackson Elementary, HVAC Replacement, 2018
•Hanley Elementary, HVAC Replacement, 2018
•Ida B Wells, HVAC Replacement, 2018
•Oakhaven, HVAC Replacement, 2022
•Raleigh Egypt HS, HVAC Replacement, 2024
•Kingsbury Middle School, HVAC Replacement, 2022
•Carver High School, HVAC Replacement, 2021
•Overton High School, HVAC Replacement, 2024